In a landmark move toward sustainable energy and economic relief, the Bank of Punjab (BOP) has introduced a Free Solar Panel Scheme Registration Program for residential users consuming less than 100 electricity units per month. Launched in mid-2025, the initiative aims to reduce the burden of rising electricity costs while promoting green energy solutions among low-income households.
As Pakistan continues to face challenges like power shortages and expensive grid electricity, the BOP solar scheme stands out as a beacon of affordability, climate-conscious development, and inclusive growth.
Overview of the BOP Solar Panel Initiative
The program is part of a broader collaboration between the Punjab government, the Bank of Punjab, and solar technology providers. The scheme provides free solar panel systems, including:
- Solar panels (sized according to need)
- Inverters
- Batteries (if required)
- Installation and maintenance support
Eligible households must register through the official BOP portal or designated bank branches. The system is designed to power basic appliances like fans, lights, and small electronics ideal for homes with low monthly electricity use.
Also Read About : Ehsaas Program 8171 Launches New Financial Assistance for Deserving Families in 2025
Who Is Eligible?
The BOP Free Solar Panel Program is specifically designed for:
- Domestic electricity users who consume less than 100 units per month
- Residents of Punjab province
- Applicants with a valid CNIC
- Individuals who are not already receiving solar panel subsidies
Those already benefiting from other government energy schemes may not qualify. However, exceptions may be considered under special conditions for senior citizens or people with disabilities.
Also Read About : Ehsaas 8171 New Web Portal Registration Form Launched for 2025 Applicants
Registration Process
The registration process is simple, transparent, and can be completed online or in person.
Online Registration:
- Visit the official BOP website or the Punjab Solar Initiative portal.
- Fill in your CNIC number, electricity bill reference number, and contact details.
- Upload a scanned copy of your recent electricity bill (showing <100 units usage).
- Submit the form and await a confirmation SMS or email.
Offline Registration:
- Visit a BOP branch or a Union Council solar facilitation center.
- Submit copies of your CNIC and last electricity bill.
- Fill out and sign the official application form.
- Receive tracking details for your application.
Once verified, eligible applicants are scheduled for a technical survey and installation appointment.
Also Read About : Bahimat Bazurg Program 2025 CM Punjab Reopens Registration for Senior Citizen Support Scheme
Benefits of the Program
- Zero upfront cost: The government and BOP cover all system expenses.
- Lower energy bills: Users can significantly reduce or eliminate their monthly electricity costs.
- Environmental impact: Less reliance on fossil fuels, reduced carbon footprint.
- Energy independence: Especially helpful in areas prone to load-shedding or poor grid infrastructure.
- Low maintenance: The program includes free servicing for 1 year after installation.
Current Status (Mid-2025)
- Over 60,000 households have registered since the scheme opened in June 2025.
- Priority is being given to remote rural areas, flood-affected districts, and underdeveloped towns.
- First-phase installations are underway in South Punjab, with plans to expand to Lahore, Faisalabad, and Gujranwala by August 2025.
Future Enhancements
- Mobile app launch for tracking registration, service status, and maintenance.
- Expansion to users under 200 units/month by 2026.
- Integration with other Punjab government subsidy programs (e.g., Rashan Riayat).
- Solar technician training programs for local job creation.
Final Thoughts
The BOP Free Solar Panel Scheme for low-consumption users is a visionary step toward building an energy-secure and environmentally friendly future. For families struggling to manage rising electricity bills, this initiative offers both financial relief and energy independence.
With easy registration, wide availability, and full government backing, this program is poised to transform how thousands of households in Punjab access power one solar panel at a time. If your home consumes fewer than 100 units a month, now is the time to take action and brighten your future with clean, free energy.
Frequently Asked Questions (FAQs)
1. What if my electricity usage slightly exceeds 100 units one month?
Eligibility is based on average consumption over the past 3 months. Occasional increases won’t disqualify you, but consistent high usage might.
2. How long does it take to get the solar panel system after registration?
Once your documents are verified, installation typically occurs within 4–6 weeks, depending on demand in your area.
3. Is there any hidden cost or maintenance charge?
No. The system and its standard maintenance are completely free for one year. After that, low-cost servicing plans will be available.
4. Can I apply if I live in a rented house?
Yes, but you must provide written permission from the homeowner during the registration process.
5. Will I still get electricity from WAPDA after installation?
Yes. Your solar system will supplement your grid supply. In most cases, it will power your essential appliances during daylight hours, reducing your grid consumption.